Hydrostatic Test Package Preparation Guide Inspection Point in ITP – QA/QC Controlled Document General Requirements Hydrostatic testing is an essential inspection activity listed in the Inspection and Test Plan (ITP). Before performing a hydrotest, the following conditions must be fulfilled: The hydrotest procedure has been approved by the client and/or consultant. All welding activities within the test boundary must be completed and inspected by all parties. Non-Destructive Testing (NDT) must be performed according to the project specification, with acceptable results. All relevant documentation must be collected for inclusion in the test package. 11 Steps to Prepare a Hydrotest Package 1. Cover Page Include project name, client, contractor, system name, line class, and test type. A sample form can be customized to suit your project format. 2. Content Sheet Provides a summary index of documents included. Pre-fill standard information (e.g., project name, test type) ...